Metro railways temporarily stop operations after Christmas quake | Inquirer

Metro railways temporarily stop operations after Christmas quake

By: - Reporter /
/ 12:15 PM December 25, 2020

MANILA, Philippines — The three railway systems in Metro Manila temporarily stopped its operations on Friday to check for possible damage that was caused by the 6.3 magnitude earthquake that rocked several Luzon areas.

In a tweet, the Light Rail Transit Authority (LRTA) said that LRT-2 suspended its trips at 9:38 a.m. to inspect for possible damages.

“To ensure passenger safety, LRT-2 temporarily suspends operations after the magnitude 6.3 earthquake this morning. Our Engineering, Maintenance, and Safety & Security Team is currently conducting foot patrol inspection to assess the integrity of LRT-2 structures,” LRTA, which manages LRT-2, said.

Article continues after this advertisement

More than two hours later, LRTA said LRT-2 operations resumed after the trains were “declared safe and fit for operations.”

FEATURED STORIES

The Christmas day earthquake also prompted the Light Rail Transit-1 (LRT-1) to suspend its operations at 8:45 a.m.

Article continues after this advertisement

“A stop for safety has been put in place from Baclaran to Balintawak due to an experienced earthquake. Inspection of the vicinity is ongoing to ensure the safety of the passengers. Please standby for updates,” read the tweet from LRT-1 management.

Article continues after this advertisement

After more than 10 minutes, LRT-1 resumed its operations.

“UPDATE: As of 08:58AM, We are Green and Go on all 19 stations of LRT1. Merry Christmas and ingat po sa biyahe!” read the tweet.

Article continues after this advertisement

In a separate statement, the Metro Rail Transit System 3 (MRT-3) advised its drivers to stop at the nearest station to temporarily halt operations due to the magnitude 6.3 quake.

“At 7:43AM, an earthquake was felt in Metro Manila. All train drivers were advised to stop at the nearest station for precautionary measures,” read the statement.

The train management then announced resumption of their operations at 8:32 a.m.

MRT-3 management also noted that inspection of its buildings and facilities is still ongoing to check for damages.

Your subscription could not be saved. Please try again.
Your subscription has been successful.

Subscribe to our daily newsletter

By providing an email address. I agree to the and acknowledge that I have read the .

The Philippine Institute of Volcanology and Seismology (Phivolcs) reported that the epicenter of the quake was located 15 kilometers southwest of Calatagan, Batangas. The quake was felt in several parts of Luzon at 7:43 a.m. With reports from Zac Sarao, trainee

RELATED STORIES:

BREAKING: Magnitude 6.3 quake shakes Luzon on Christmas Day
No injury, damage so far in Batangas after magnitude 6.3 quake

JE
MOST READ
www
entertainment
entertainment
entertainment
www
globalnation
TAGS: Damages, Earthquake, LRT 1, LRT 2, Metro Manila, MRT

Your subscription could not be saved. Please try again.
Your subscription has been successful.

Subscribe to our newsletter!

By providing an email address. I agree to the and acknowledge that I have read the .

© Copyright 1997-2024 | All Rights Reserved

This is an information message

We use cookies to enhance your experience. By continuing, you agree to our use of cookies.