Public assured of measured, gradual dam water release

Public assured of measured, gradual dam water release

/ 04:20 PM October 24, 2024

The National Power Corporation (Napocor) on Thursday assured the public, especially those living in low-lying areas, of a measured and gradual release of dam water

DAM SPILL Operators of San Roque Dam in Pangasinan, shown in this photo taken in 2011, opened four floodgates to release water in excess of its normal capacity level. INQUIRER file photo / WILLIE LOMIBAO

MANILA, Philippines – The National Power Corporation (Napocor) on Thursday assured the public, especially those living in low-lying areas, of a measured and gradual release of dam water to prevent massive flooding as Severe Tropical Storm Kristine (international name: Trami) continues to dampen most of Luzon and parts of Visayas.

Napocor Flood Operation Manager Maria Teresa Sierra explained that under their previous protocol, the release of water will only be carried out when the dam reaches spilling level which in the past has exacerbated flood woes in some areas.

Article continues after this advertisement

READ:

FEATURED STORIES

Napocor manages 12 dams all over the country, including five major dams in Luzon, namely Angat Dam, Caliraya Dam, Ambuklao Dam, Binga Dam, and San Roque Dam.

“So right now ‘yung assurance natin ay talagang (our assurance is really) as much as possible we would like to assure the communities na minimize na po ‘yung [measured water release is already minimized] … unless we would be experiencing ‘yung sabihin natin na malakas na talaga na pag-ulan (a heavy downpour),” Sierra said in a Palace press briefing.

Article continues after this advertisement

READ: Marcos orders gradual release of water in dams

Article continues after this advertisement

“Pero (But) right now, si Napocor assured na po ‘yung ating mga communities (Napocor already assured our communities),” she added.

Siera also noted that the change in protocol is in line with the directive of President Ferdinand R. Marcos Jr. to dam operators Wednesday to release water ahead of the expected heavy rainfall from Kristine to mitigate flooding in downstream communities.

Your subscription could not be saved. Please try again.
Your subscription has been successful.

Subscribe to our daily newsletter

By providing an email address. I agree to the and acknowledge that I have read the .

EDITORS' PICK
cebudailynews
usa
entertainment
pop
sports
globalnation
www
www
sports
business
globalnation
TAGS: dam, Flood, Kristine, NAPOCOR, water

Your subscription could not be saved. Please try again.
Your subscription has been successful.

Subscribe to our newsletter!

By providing an email address. I agree to the and acknowledge that I have read the .

© Copyright 1997-2024 | All Rights Reserved

This is an information message

We use cookies to enhance your experience. By continuing, you agree to our use of cookies.