EDC working 24/7 to restore power in Leyte | Inquirer

EDC working 24/7 to restore power in Leyte

By: - Bureau Chief /
/ 04:39 PM July 08, 2017

Cracks caused by the magnitude 6.5 earthquake on Thursday, July 6, 2017, are visible in Barangay Tongonan, Ormoc City in Leyte. On the background are steams coming from the geothermal power plants ran by the Energy Development Corp. Photo courtesy of Cathy Ig-agao Panganiban

Power plants of the Energy Development Corp. (EDC) may be able to restore power supply in Leyte within 10 days when repairs had been done on the damages caused by the magnitude 6.5 earthquake.

READ: EDC shuts down geothermal power plants in Ormoc

Article continues after this advertisement

“Our team of contractors has been mobilized to work 24/7, safety considerations permitting, to complete the assessment and accelerate return to service,” said in a statement.

FEATURED STORIES

“Barring any unforeseen issues, EDC could have about 317 MW (megawatts) of power restored to Leyte within the next 10 days,” it added.

The statement said Energy Secretary Alfonso Cusi inspected the facilities along with EDC president Richard Tantoco, who had been at the site since Friday.

Article continues after this advertisement

Based on the ongoing assessment, the Tongonan Geothermal Power Plant Unit 1 may not be operational for some time due to damage to the cooling tower.

Article continues after this advertisement

Unit 2 with power capacity of 35 megawatts may be operational in the next seven to 10 days as tests on the unit and the main transformer as well as cooling tower repair needed to be performed.
READ: Leyte quake aftermath: Visayas power reserve plummets

Article continues after this advertisement

The Upper Mahiao plant would be operational in five to seven days, bringing 132 MW back to the grid.

Units 1 and 2 of the Malitbog power plant were estimated to return to service within the next 7 to 10 days bringing about 150 MW of power back online.

Article continues after this advertisement

“Unit 3 however, will remain on shutdown due to damage sustained by the cooling tower,” the statement said.

“Access to our Mahanagdong plant remains difficult and we have not yet been able to assess the extent of damage. We are still working to clear landslide debris,” he added.

The marshalling station would be in operation in three to five days since the repair had been started.

Your subscription could not be saved. Please try again.
Your subscription has been successful.

Subscribe to our daily newsletter

By providing an email address. I agree to the and acknowledge that I have read the .

Aside from transmitting power from the plants, these repairs will also allow the connection of the station to the 230 kV line to Luzon.  JPV

EDITORS' PICK
sports
entertainment
usa
globalnation
usa
business
TAGS: Energy Development Corp.

Your subscription could not be saved. Please try again.
Your subscription has been successful.

Subscribe to our newsletter!

By providing an email address. I agree to the and acknowledge that I have read the .

© Copyright 1997-2024 | All Rights Reserved

This is an information message

We use cookies to enhance your experience. By continuing, you agree to our use of cookies.