黑料社

MRT-3 suffers electrical glitch, disembarks 1K passengers

MRT

EDSA

A northbound train of the Metro Rail Transit-3 (MRT-3) stopped and offloaded 1,000 passengers due to an electrical failure on Friday afternoon.

At 12:23 p.m., passengers were unloaded at Shaw Station due to electric failure in the train鈥檚 motor, an MRT-3 advisory showed.

Passengers, however, were conveyed in the next train, which arrived one minute later.

MRT authorities said one cause of electrical failure was worn out electrical sub-components.

This latest technical glitch was noted as category 3, which means that the train was either 鈥渞emoved without replacement鈥 or that a 鈥渃ancellation of loops and insertion鈥 was made.

The MRT immediately continued its operations with 14 available running trains by 1:00 p.m.听听听听 听听听听听听听听听听听 /kga

MOST READ
LATEST STORIES
Read more...