More than 700 passengers of the Metro Rail Transit-3 (MRT-3) train were unloaded on Monday in Mandaluyong City following a technical glitch.
In an advisory, MRT-3 media relations officer Aly Narvaez said that 740 passengers were offloaded in the southbound section of Shaw Boulevard station because of an 鈥渆lectrical failure in our motor鈥 at 6:45 p.m.
The cause of the system failure was 鈥渨orn-out electrical sub-components,鈥 Narvaez added.
The affected commuters were then loaded on a next train which arrived three minutes after the incident, she said./ac
MOST READ
LATEST STORIES